FG stops work on Sagamu-Iperu Road overpoor quality
Sagamu-Iperu Road
Sagamu-Iperu Road
The Federal Government has directed that work should stop on the 12km Sagamu-Iperu Road by the Sagamu Interchange on the Lagos-Ibadan Expressway.
The Minister of Works, Sen. Dave Umahi, gave the directive on Thursday during an inspection tour of road projects in Lagos and Ogun states.
He expressed displeasure at the quality and speed of work on the road.
He gave a seven-day period to the contractor handling the project to remedy the situation and remove the stone base.
Umahi also directed the contractor to bring in the right milling machine and the right mixture of stone base.
He also directed the contractor to speed up the work.
Related News
$79.5bn suit: FG, Binance clash over court papers’ exchange
Tinubu to visit Katsina for security assessment, project inauguration Friday
May Day: Oyo tertiary institutions, judiciary yet to enjoy new minimum wage – NLC
The minister said that the contractor had all the ramps and retaining walls on some bridges.
He added that some piers on some of the bridges had rusted rods.
“That is very dangerous. I am giving seven days, I am leaving behind the design head so that they can work till Sunday to come up with a comprehensive drawing and then costing so that I can appeal to Mr President.
“This is very urgent. If any of them should collapse, it will take multi-billion Naira to get them reconstructed, but now it will take less to get them amended.”
Post a Comment